For Commercial General Contractors

Deliver every project from proposal through closeout on one connected operating platform.

CompleteVue connects procurement, project controls, project readiness, field execution, vendor management, and executive visibility into one connected operating platform built specifically for commercial general contractors.

Every team works from the same connected project record, giving estimators, project managers, superintendents, and executives complete visibility from proposal intake through final closeout.

Connected Project Delivery

Every project follows one connected workflow.

From procurement through closeout, every workflow inside CompleteVue builds on the one before it. Awards become commitments, commitments become budgets, work packages organize execution, field activity updates project controls, and every decision contributes to one connected project record.

Build the Buyout

Every proposal becomes structured project data. Compare scope, level proposals, negotiate confidently, and award work with complete traceability into buyout.

Control the Budget

Awarded work automatically creates commitments, budgets, schedules of values, and project controls that remain connected throughout the project.

Mobilize with Confidence

Know exactly when every work package is ready to begin. Contracts, insurance, compliance documentation, submittals, and project requirements remain connected to every work package.

Execute in the Field

Daily reports, inspections, RFIs, photos, meetings, and progress updates continuously update the connected project record and executive visibility.

Run Procurement

Every trade package. One connected procurement workspace.

Manage every trade package from proposal intake through buyout inside one connected procurement workspace that continuously evaluates readiness, recommendations, and operational progress.

Instead of moving between isolated tools, general contractors run the entire procurement workflow inside one workspace. Every trade package shares the same operational record, so proposals, mappings, comparisons, recommendations, awards, and buyout activity remain connected throughout the project lifecycle.

One continuous procurement workflow

Proposal Intake
Proposal Mapping
Proposal Comparison
Recommendation
Award
Buyout
app.completevue.com/bid-comparison/summit-earthworks
Proposal package · Sitework & grading
Level 3 proposals · Meridian Tower Ph. 2
Ready to award
Leveled scope line
Summit Earthworks, LLC
Peakline Sitework
Ridgeview Earthworks
Site preparation & erosion control
$182,400
$174,900
$198,600
Mass excavation (48,200 cy)
$612,750
$598,300
$641,200
Structural fill & compaction
$204,100
$219,800
$212,500
Storm drainage & underground utilities
$318,600
$305,200
$328,900
Curbs, sidewalks & paving base
$146,800
$152,300
$139,750
Leveled total (best-of-scope)
$1,464,650
$1,450,500
$1,520,950
Awarding cascades contract, SOV, and budget commitments automatically.Award to Peakline
app.completevue.com/subcontractor-compliance
Subcontractor compliance
52 vendors · 4 expiring in 14 days
Vendor
COI
W-9
License
Mobilization readiness
Peakline Sitework
100%
Ironbridge Concrete
82%
Meridian MEP Services
74%
Envelope Systems Group
96%
Northline Finishes
48%

Project Readiness

Know exactly when every work package is ready to begin.

Every awarded work package continuously evaluates the operational requirements needed before field work begins. Contracts, insurance, compliance documents, licenses, submittals, budget approvals, and schedule readiness remain connected to the work package throughout the project lifecycle.

Instead of tracking readiness across spreadsheets, emails, and disconnected systems, CompleteVue continuously monitors every prerequisite against the connected project record. Teams always know what is complete, what requires attention, and when work can safely mobilize.

Readiness is evaluated automatically

Contract Executed
Insurance Verified
Compliance Documents Complete
Required Submittals Approved
Budget Approved
Work Package Scheduled
Ready to Mobilize

CONNECTED FIELD EXECUTION

The field becomes the source of truth.

Every inspection, daily report, photo, issue, production update, and work package activity is captured once and immediately becomes part of the connected project record.

Instead of creating isolated field logs, CompleteVue automatically links field activity to work packages, schedules, RFIs, issues, project controls, and executive reporting. Every update improves visibility across the entire project without duplicate entry or manual reporting.

app.completevue.com/daily-reports/2026-07-22
Daily report · Meridian Tower Ph. 2
Wednesday, July 22, 2026
Submitted
84°F · ClearWind 6 mphNo weather delay
Crews on site
42
Man-hours logged
312
Equipment active
11
Connected Work Package Activity
Linked Inspections · Connected RFIs · Issue Tracking
WP-042 · Elevated Deck Placement
Ironbridge Concrete
Inspection passed
Placed 68 cy at Grid F1–G3, screed and cure applied.
58% → 72%
PHOTO-118 attached
WP-061 · L4 MEP Rough-in
Meridian MEP Services
Inspection failed · ISS-207
Rough-in complete on Level 4 east core; inspection scheduled.
74% → 82%
RFI-247 linked
WP-078 · Curtain Wall L6 South
Envelope Systems Group
On schedule
Set 22 curtain-wall panels on Level 6 south elevation.
41% → 49%
MTG-034 pre-install review
Attached site photos
Wide overview of the Meridian Tower Ph. 2 jobsite with tower cranes
Ironworker guiding a structural steel beam into place
Crew placing and screeding concrete on an elevated deck
Tower crane lifting a bundle of rebar to an upper level
Interior metal stud framing on an upper floor
MEP rough-in with ductwork, conduit, and copper piping overhead
18 photos · linked to 3 work packages 2 safety observations
Auto-linked Project Record
Connected
  1. Daily Report DR-0722
    Submitted · Meridian Ph. 2
  2. Linked Inspection INS-118 failed
    L4 MEP · condensate slope
  3. Issue Tracking ISS-207 created
    Assigned · Meridian MEP
  4. Connected work package WP-061 updated
    Progress 74% → 82%
  5. Schedule Progress Updated
    Activity A-3140 · +6% earned
  6. Forecast Recalculated
    EAC exposure +$18.4k
  7. Executive Dashboard Updated
    Meridian portfolio · live

Run every commercial project from one connected operating platform.

CompleteVue connects procurement, project controls, project readiness, field execution, vendor management, and executive visibility into one connected operating platform built specifically for commercial general contractors.